Tidewater Home Improvement LLC
Scope of Work & Estimate
6993 Tracey Court
6993 Tracey Court — bathroom drywall repair
$750 Estimate
6993 Tracey Court · Gloucester, VA
Small Bathroom Drywall Repair · Demo Completed by Homeowner
Print / PDF View Pictures Expires: 08/27/2026
Project Overview
Customer: Melissa Harms
Project: Drywall Repair — Small Bathroom
Address: 6993 Tracey Court, Gloucester, VA
Demolition: Completed by homeowner — no demo charge
Scope: Drywall install + repair (holes, shower seams)
Finish: Level 4 smooth, PVA-primed, paint-ready
Included Scope
10107Drywall Repair & Finish — Small BathroomIncluded
  • Install: hang water-resistant drywall (Greenboard) over exposed stud cavities along the lower walls, cutout corners, and vanity back
  • Repair: repair wall holes and tape seams by the shower
  • Finishing: tape joints, 3 coats of mudding, feathering into existing drywall, and fine sanding to a smooth Level 4 finish
  • Priming: 1 coat of drywall PVA primer over bare joint compound and drywall paper — ready for paint
Optional Add-On — Interior Painting
10113Paint Bathroom — Professional ApplicationOptional
  • Preparation: spot sanding of patched areas
  • Priming: dedicated PVA drywall primer over new drywall — prevents uneven paint absorption
  • Topcoats: 2 coats of moisture-resistant satin or semi-gloss bathroom paint (mildew-resistant, formulated for high-humidity areas)
  • Trim: painting trimmed baseboards
Itemized Estimate
10107 — Drywall Install, Repair & Finish (materials included: Greenboard, screws, joint tape, setting & joint compound, PVA primer)$750.00
10113 — Interior Painting (optional add-on)$600.00
ESTIMATED PROJECT TOTAL$750.00

Multi-visit drywall finishing (mud drying between coats) is billed at a flat rate — no hourly surprises. Optional painting added: $1,350.00 total.

Inspection Pictures
View all inspection pictures →
Terms & Conditions

By agreeing to these Terms and Conditions, the customer acknowledges and accepts the outlined responsibilities and scope of work.

Scope: All work described in the Included Scope above. Any work not listed is not included unless agreed in writing.

Structural excluded: header reinforcement, joist repairs, subfloor sheet replacement, engineering, foundation modifications.

Owner supplies: none — this estimate is materials-inclusive.

Paint: optional add-on at $600.00 (materials included). Drywall is delivered Level 4 paint-ready with PVA primer applied either way.

Notes:
**Jobsite will be left clean once completed.

Warranty:
**12 months workmanship.

Payment Terms:
· Total Project Cost: $750.00 (with optional paint: $1,350.00)
· Deposit to Schedule: $375.00 (50%)
· Final Payment: $375.00 (50%)

Check is a preferred method.
**You can pay by credit card using the link below.
https://request.plastiq.com/pay-tidewater-home-improvement-llc
Cards not eligible for payment:
- Virtual Affirm credit card

Validity: one (1) week from the date above.